Grid Connections
The location of the proposed power Project is around 0.6 KM from the 132 kV Dhabeji – BOC 132kV transmission line which lies in the system network of K‐Electric (formerly known as KESC).
Evacuation of power from FPCL to K‐Electric Network is achieved after step up to 132kV by Looping in‐out arrangement in between existing 132 kV Dhabeji – BOC 132 kV single circuit at the FFBL switchyard (132kV Duplicate Bus ) via 132 kV transmission line.