plant output and performances

Plant is designed, erected, installed and commissioned as per internationally accepted standards and best practices. Key performance parameters of the Plant are as as under:

  • Installed Capacity: 118 MW
  • Power Generation Frequency & Voltage: For KE @ 50Hz & 11 / 132 KV
  • Power Generation Frequency & Voltage: For FFBL@ 60Hz & 13.8 / 13.8 KV
  • Plant Configuration:
    • 02 x 250 Metric Ton / Hour – CFB Boilers
    • 02 x 24 MW + 01 x 10 MW – 60Hz STG Block
    • 01 x 60 MW – 50 Hz STG Block
  • Annual Availability : 85 % (310 days)
  • Net Power Plant Efficiency : 29.2 %

Energy Balance

 

Each unit will be designed, manufactured, installed and commissioned as per internationally accepted practices and standards. The Project’s estimated key performance data and energy balance is set out below:

  • Power Installed Capacity 118 MW
  • Installed FFBL Power Capacity at 60 Hz 58 MW; for FFBL and Auxiliary power consumption
  • K‐Electric/Bulk Power Consumers at 50 Hz 60 MW
  • Days Operation 310
  • Net Plant Efficiency % 29.2